/new/ SMR Project

Roadmap

Technology

Fermi Energia has selected GE Hitachi Nuclear Energy’s BWRX-300 small modular reactor for deployment in Estonia by the early 2030s.

Main technical parameters

 
Reactor typeBWR – boiling water reactor
Electric power output300 MWe
Thermal power output870 MWth
CoolantH2O
Neutron moderatorH2O
Designed lifespan60 years (extendable)
Capacity factor95%
Ability to regulate power50-100% daily, 0.5% per minute
Fuel cycle12-24 months
Fuel typeUO2
Fuel enrichment (average)3,4%
Emergency fuelNot needed
Estimated probability of nuclear damageLess than 10‑7 per reactor year
Construction time (for 1 + n reactor)26 months
Construction cost (for 1 + n reactor), estimated1 billion euros for the plant’s first reactor, construction cost will lower with next reactors
Cost of electricity generation, estimated50-60 €/MWh